检索范围:
排序: 展示方式:
Future urban transport management
《工程管理前沿(英文)》 页码 534-539 doi: 10.1007/s42524-023-0255-3
关键词: future urban transport management travel behavior characteristics transportation operations transportation emergency management transportation decision intelligence
Current state and future perspectives of sewer networks in urban China
Dong Huang, Xiuhong Liu, Songzhu Jiang, Hongchen Wang, Junyan Wang, Yuankai Zhang
《环境科学与工程前沿(英文)》 2018年 第12卷 第3期 doi: 10.1007/s11783-018-1023-1
关键词: Sewer network China Management Sewer corrosion Sewer inspection Trenchless rehabilitation
王伯鲁
《中国工程科学》 2002年 第4卷 第10期 页码 79-83
以人类运输活动所采用的主要驱动力为依据,把运输技术的发展历史划分为四个基本阶段;概括地指出了载体技术与路港技术是构成运输技术系统的基本单元,其间的矛盾运动推动着运输技术进步;阐述了运输技术体系的内部构成与外部联系;从运输活动的基本矛盾出发,结合当代科技与社会发展现实,对现代运输技术的四个发展方向做了概括性描述。
Machine learning in building energy management: A critical review and future directions
《工程管理前沿(英文)》 2022年 第9卷 第2期 页码 239-256 doi: 10.1007/s42524-021-0181-1
关键词: building energy management machine learning integrated framework knowledge evolution
Operations management of smart logistics: A literature review and future research
Bo FENG,Qiwen YE
《工程管理前沿(英文)》 2021年 第8卷 第3期 页码 344-355 doi: 10.1007/s42524-021-0156-2
关键词: smart logistics operations management optimization Internet of Things
David A. Wyrick,Warren Myers
《工程管理前沿(英文)》 2016年 第3卷 第3期 页码 203-205 doi: 10.15302/J-FEM-2016046
关键词: Grand Challenges urban infrastructure development engineering management system of systems strategic management engineering management case study
张彦仲
《中国工程科学》 2002年 第4卷 第8期 页码 1-7
阐述了中国直升机、运输机的现状,未来发展思路和具体实施计划;介绍了中国在产的直升机、运输机,在产的直升机有直11(2吨级)、直9(4吨级)、直8(13吨级)系列,在产的运输机有运5、运7、运8、运12和农5系列;提出了改进生产一代、研制发展一代、预研攻关一代的发展思路,制定了直升机改进生产以直8、直9、直11为主,研制以6吨级直升机为主,预研以10吨级直升机为主的发展计划;运输机改进生产以运8、运12为主,研制以涡扇支线飞机为主,发展以大型运输机为主的实施计划;提出了突破直升机发动机、旋翼、传动、抗坠毁、复合材料关键技术的措施;指出直升机、运输机发展要坚持自主开发和国际合作、技术和贸易、军用和民用相结合,建议把直升机、运输机纳入国家长远发展规划。
Yesterday, Today and Future of the Engineering Management Body of Knowledge
Hiral Shah,Walter Nowocin
《工程管理前沿(英文)》 2015年 第2卷 第1期 页码 60-63 doi: 10.15302/J-FEM-2015009
关键词: body of knowledge engineering management certification exam engineering manager competency areas
《工程管理前沿(英文)》 2023年 第10卷 第2期 页码 191-205 doi: 10.1007/s42524-022-0243-z
关键词: quality management Quality 4.0 Industry 4.0 literature review predictive quality
Xiong NING, Yi LIU, Jining CHEN, Xin DONG, Wangfeng LI, Bin LIANG
《环境科学与工程前沿(英文)》 2013年 第7卷 第5期 页码 658-668 doi: 10.1007/s11783-013-0546-8
关键词: wastewater infrastructure land use environmental carrying capacity fluctuating population urban runoff
Fang-Le PENG, Yong-Kang QIAO, Soheil SABRI, Behnam ATAZADEH, Abbas RAJABIFARD
《结构与土木工程前沿(英文)》 2021年 第15卷 第1期 页码 20-45 doi: 10.1007/s11709-021-0716-x
关键词: urban underground space Sustainable Development Goals spatial data infrastructure underground land administration integrated planning
Satellite scheduling engine: The intelligent solver for future multi-satellite management
《工程管理前沿(英文)》 2022年 第9卷 第4期 页码 683-688 doi: 10.1007/s42524-022-0222-4
Research and Practice of Meta-synthesis Management for the Government-led Urban Complex Construction
Ru-gui Chen,Jia-meng Chen
《工程管理前沿(英文)》 2014年 第1卷 第1期 页码 52-61 doi: 10.15302/J-FEM-2014008
关键词: government-led construction project urban complex meta-synthesis management sustainable development benefit maximization
Andrew LOCKLEY, Zhifu MI, D’Maris COFFMAN
《工程管理前沿(英文)》 2019年 第6卷 第1期 页码 38-51 doi: 10.1007/s42524-019-0010-y
Geoengineering is a proposed response to anthropogenic global warming (AGW). Conventionally it consists of two strands: Solar Radiation Management (SRM), which is fast-acting, incomplete but inexpensive, and Carbon Dioxide Removal (CDR), which is slower acting, more expensive, and comprehensive. Pairing SRM and CDR offers a contractually complete solution for future emissions if effectively-scaled and coordinated. SRM offsets warming, while CDR takes effect. We suggest coordination using a blockchain, i.e. smart contracts and a distributed ledger. Specifically, we integrate CDR futures with time and volume-matched SRM orders, to address emissions contractually before release. This provides an economically and environmentally proportionate solution to CO2 emissions at the wellhead, with robust contractual transparency, and minimal overhead cost.
关键词: Geoengineering Solar Radiation Management Carbon Dioxide Removal futures markets smart contracts blockchain
《工程管理前沿(英文)》 2022年 第9卷 第2期 页码 221-238 doi: 10.1007/s42524-022-0195-3
关键词: knowledge transfer knowledge management project management project environment literature review
标题 作者 时间 类型 操作
Current state and future perspectives of sewer networks in urban China
Dong Huang, Xiuhong Liu, Songzhu Jiang, Hongchen Wang, Junyan Wang, Yuankai Zhang
期刊论文
Operations management of smart logistics: A literature review and future research
Bo FENG,Qiwen YE
期刊论文
Strategic Project Management to Use the Grand Challenge Scholars Program to Address Urban Infrastructure
David A. Wyrick,Warren Myers
期刊论文
Yesterday, Today and Future of the Engineering Management Body of Knowledge
Hiral Shah,Walter Nowocin
期刊论文
From total quality management to Quality 4.0: A systematic literature review and future research agenda
期刊论文
Sustainability of urban drainage management: a perspective on infrastructure resilience and thresholds
Xiong NING, Yi LIU, Jining CHEN, Xin DONG, Wangfeng LI, Bin LIANG
期刊论文
A collaborative approach for urban underground space development toward sustainable development goals: Critical dimensions and future directions
Fang-Le PENG, Yong-Kang QIAO, Soheil SABRI, Behnam ATAZADEH, Abbas RAJABIFARD
期刊论文
Research and Practice of Meta-synthesis Management for the Government-led Urban Complex Construction
Ru-gui Chen,Jia-meng Chen
期刊论文
Geoengineering and the blockchain: Coordinating Carbon Dioxide Removal and Solar Radiation Managementto tackle future emissions
Andrew LOCKLEY, Zhifu MI, D’Maris COFFMAN
期刊论文